Korangi Crossing flyover Needs Attention 

If anyone is interested, they can make a documentary about the Flyover being constructed at the Crossing near CBM in Korangi, Karachi. The pillers have scanty and very little iron /steel rods (sarya) in them, it will not be able to bear the weights of huge oil and water tankers that need to. Go over this in future.

The flyover will collapse and fall after it is built. Better to stop such faulty construction now and start a investigation to use proper material and architectural design. We should do this story now rather than when flyover falls and lives are lost.

By Dr. Vasi

Add Comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.